Prime contractor to San Diego Unified School District · San Diego, CA
Replacement of the main 12 kV switch and transformer equipment that serves the entire De Portola Middle School campus, built on an accelerated schedule while the school stayed in operation.
Scope of work
- Safe-off of the existing 12 kV medium-voltage circuit from the SDG&E substation
- Demolition of the existing switch and transformer equipment
- Equipment pad modified and extended for the larger new equipment
- New 12 kV to 208/120 V transformer with transition and distribution sections
- Existing panel feeds and campus site power reconnected
- Temporary industrial generators kept the campus’s critical systems online for the full project
Close coordination between the district’s design team, our field crew and suppliers kept the accelerated schedule on time.